Ford 99-03 7.3L Stage 1 LONG LEAD Injector Set 15 Percent Over Dynomite Diesel

$3,724.83
GHJG_DDP.AE-1

Ford 99-03 7.3L Stage 1 LONG LEAD Injector Set 15 Percent Over Dynomite Diesel

$3,724.83

Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 1 injector set WITH long lead injector for cylinder #8. New injectors have been fully balanced with 140cc injector bodies and 15 percent over nozzles. Approximately 50 RWHP over stock. Safe on stock trucks. Excellent for towing applications.

Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-1

Details:

  • Liter: 7.3
  • Engine: Powerstroke
  • Years: 1999-2003
  • Fuel Type: Diesel
  • Condition: New
  • Not For Sale In California

You may also like