{"product_id":"ford-99-03-7-3l-stage-1-long-lead-injector-set-15-percent-over-dynomite-diesel","title":"Ford 99-03 7.3L Stage 1 LONG LEAD Injector Set 15 Percent Over Dynomite Diesel","description":"\u003cp\u003eFord 99-03 7.3L Powerstroke Injector Set: \u003cspan\u003eBrand new (not reman) stage 1 injector set WITH long lead injector for cylinder #8.  New injectors have been fully balanced with 140cc injector bodies and 15 percent over nozzles.  Approximately 50 RWHP over stock.  Safe on stock trucks. Excellent for towing applications.\u003c\/span\u003e\u003c\/p\u003e\u003cp\u003eNote:  This injector set is intended for vehicles which have the long lead injector in cylinder #8.  If you are unsure or do not want to take the time to check then order DDP AD-1\u003c\/p\u003e\u003cp\u003e\u003cstrong\u003eDetails:\u003c\/strong\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003eLiter: 7.3\u003c\/li\u003e\n\u003cli\u003eEngine: Powerstroke\u003c\/li\u003e\n\u003cli\u003eYears: 1999-2003\u003c\/li\u003e\n\u003cli\u003eFuel Type: Diesel\u003c\/li\u003e\n\u003cli\u003eCondition: New\u003c\/li\u003e\n\u003cli\u003eNot For Sale In California\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Dynomite Diesel","offers":[{"title":"Default Title","offer_id":53354729734424,"sku":"GHJG_DDP.AE-1","price":3724.83,"currency_code":"USD","in_stock":true}],"url":"https:\/\/dirtydiamondperformance.com\/products\/ford-99-03-7-3l-stage-1-long-lead-injector-set-15-percent-over-dynomite-diesel","provider":"Dirty Diamond Performance","version":"1.0","type":"link"}